Work in Progress

The power pole replacement project on the back 9 is more than half-way complete, the number 12 basket has been moved to the left about 40 feet. The number 16 basket has been moved to the right and into the woods. Hole 13 is only playable in the short position so we’ll be playing that twice in the Howler this coming weekend.